CV 2000 to 2010
12/2008 – 12/2011 |
Turkey |
H. P. Gauff Ingenieure GmbH & Co. KG, Frankfurt, Germany Mr. Joachim Glasenapp |
Team Leader - Engineer According to FIDIC P&DB |
Supervision of construction for Sanliurfa biological WWTP for Organized Industrial Zone 2 with 1200 ha Infrastructure (roads, Wastewater & Stormwater networks, electrical and natural gas network, telecommunication, water supply and storage tank); FIDIC P&DB-Contract Conditions; EuropeAid/125260/D/SER/TR Total value of Consultant’s contract: 1.6 million €. |
4/2008 - 4/2009 |
Croatia |
Steinbacher- Consult/SCE |
Procurement Expert/ Expert for Tender Evaluation |
Works tender evaluation for EuropeAid 125770/D/WKS/HR/1 Construction of Waste Water Treatment Plant in the Town of Karlovac, Contract Conditions, ca. 16 million €. Preparation of FIDIC Plant & Design build Contract Tender Dossier EuropeAid/127425/D/WKS/HR Construction and Rehabilitation of Water Supply and Wastewater Systems in the Town of Karlovac, FIDIC P&DB Contract Conditions, ca. 18 million € and Supply Tender Preparation according PRAG. |
2/2007 – 7/2008 |
Turkey |
H. P. Gauff Ingenieure GmbH & Co. KG, Frankfurt, Germany |
Team Leader/ Project Manager - Engineer According to FIDIC CoC |
Water Supply and Sewerage Project Sivas (250,000 Inhabitants) Construction Supervision Phase: 1. Lot 1, Water Supply Network 2. Lot 2, Sewerage and Storm water System (FIDIC RED BOOK) 3. Lot 3, Full Biological WWTP (FIDIC P&DB BOOK) Supervision of construction for SIVAS WWTP 79,000 m3/day; FIDIC P&DB-Contract Conditions and Stormwater Network FIDIC Red Book Contract Conditions; Total value of Consultant’s contract: 1.7 million €. |
7/2006-3/2007 |
Turkey; Sanliurfa |
H. P. Gauff Ingenieure GmbH & Co. KG, Frankfurt, Germany |
Team Leader and Process Engineer |
Feasibility Study Sewage Disposal and WWTP Sanliurfa (first stage 680,000 p.e. & 140,000 m3/day; second stage 910,000 p.e.); funding by KfW, Variant Analysis WWTP and design and analysis of sludge disposal alternatives. |
09/2006 - 11/2006 |
Bulgaria; Sofia |
EC Delegation |
Independent Observer, Procurement Expert |
Works tender evaluation for EuropeAid 123191/D/WKS/BG – Bourgas-Meden Rudnik Wastewater Collection and Treatment in Bulgaria |
3/2006 to 07/2007 |
Bulgaria; Lovech/ Sevlievo/Montana |
Safege /France |
Team Leader/ Project Manager Supervision |
Supervision of construction for Lovech; 40,000 m3/day, Montana 48,000 m3/day & Sevlievo; 32,000 m3/day WWTPs; wastewater collection and treatment utilities in Bulgaria, ISPA-Project No. 2002/BG/16/P/PE/011 012 014; EUROPEAID/116754/D/SV/BG; Conditions of contract: FIDIC Plant and Design Build Book. Total value of Consultant’s contract: 2.9 mill. €. |
11/2004 to 05/2005 |
Bulgaria; Rousse and Sliven |
IC Vienna |
Process Design Engineer |
Preparation of Investment Projects for “Upgrading of the whole water cycle processes for Water and Sewerage Systems in Rousse (38,000 m3/day and Sliven (32,000 m3/day)”. Drinking water and sewer networks according to FIDIC Red Book; WWTPs according to FIDIC Plant and Design Build Book; FS and AP under the ISPA Financial Instrument.
|
03/2005 to 06/2006 |
Germany, Poland, Russian Federation |
IPRO Dresden |
Process Design Engineer |
Preparation of Investment Projects for Upgrading of Water and Sewerage Systems in Frankfurt/Oder, Piła, and Khabarovsk. Optimisation of WWTPs. Underground Treatment Process for Drinking water. |
05/2002 to 09/2002 |
Macedonia Samokov Region |
PROWA Black & Veatch GmbH |
Team Leader and Process Engineer |
Feasibility Study Urban Water Supply System for the Samokov Region. ISPA Measures. |
08/2001 to 03/2004 |
MacedoniaMEAP-Programm |
PROWA Black & Veatch GmbH |
Programme Manager / Process Design Engineer/ Project Manager Supervision |
Municipal and Environmental Action Programme (MEAP) Rehabilitation / extension / new construction of a multitude of Water Works and WWTPs and sewerage systems, programme control and management, design and engineering, tender documents and procurement, implementation, commissioning, works supervision. Capacities of 40,000 to 330,000 PE ; Conditions of contract: FIDIC Red Book and FIDIC Plant and Design Build Book. Funding: EBRD. Total value of Consultant’s contract: 4.9 mill. €. Draft design, Tender Dossier, Evaluation and Contracting for the WWTP Kumanovo, FIDIC Plant and Design Build Book, (16 m Sfr), (Seco Swiss) |
09/1998 to 04/2000 |
Macedonia |
PROWA Black & Veatch GmbH |
Process Design Engineer |
Feasibility study for the catchment area of the Studencica-Zletovica (RWSS) Water Supply System. This system comprises the source, 78 km of main pipelines, the main distribution station, pressure valve stations, pump stations and the local networks (KfW-Financed). |
1/2004 to 3/2004 |
MacedoniaStip & Veles
|
Prowa Consulting & Contracting GmbH |
Procurement Expert
|
Review of the Preliminary Study (technical and contractual tasks). WWTP’s Stip (48 000 p.e) and Veles (56 000 p.e.) prepared by MOTA & COMPANHIA, sa./COBA. Advice to the Water Utilities of Stip and Veles for the Construction of the Wastewater Treatment Plant’s. |
11/2001 – 10/2003 |
Montenegro Podgorica |
PROWA Black & Veatch GmbH |
Team Leader and Process Expert |
Pre-Feasibility Study WWTP Podgorica (90 000 p.e.), Montenegro, financed by municipality. Design of Drinking Water Reservoir Lyubovic, Podgorica |
04/2001 to 09/2001 |
Poland; Warschau |
HPC Harress-Pickel-Consult AG |
Expert for Tender Evaluation |
Independent Observer for Evaluation of tenders for works under PHARE, Poland, Project PL 9907.02: Bytom Waste Water Treatment Plant (5-6/2001), FIDIC Plant and Design Build Contract Independent Observer for Evaluation of tenders for works under PHARE, Poland, Project PL 9907.03: Modernisation and Extension of the Central WWTP in Tomaszów Mazowiecki – Sludge part (7-8/2001), FIDIC Plant and Design Build Contract |
07/2003 to 09/2003 |
Turkey, Ankara |
HPC Harress-Pickel-Consult AG |
Expert for Tender Evaluation |
Evaluation of service tender: Technical Assistance for Environmental Heavy Cost Investment Planning, Turkey, EUROPEAID/114715/D/SV/TR,(6-7/2003) |
04/2003 to 06/2003 |
Slovenia |
HPC Harress-Pickel-Consult AG |
Expert for Tender Evaluation |
Evaluation of tenders for works under PHARE - contract N° 2003/58533 Slovenia (5/2003): The waste water treatment plant and corresponding sewage system Volče” and “Ecological Rehabilitation of the Idrijca River”, FIDIC Red Book. |
9/2002 to 4/2004 |
Latvia; Rezekne |
AWT - Austrian Water Technologies, Vienna / SAFEGE |
Process Expert for Potable Water Treatment |
Development of the services for the whole water cycles in the river basins of eastern Latvia and Rèzekne city (19 municipalities-project) Europeaid/112990/D/SV/LV. Used Contract Conditions were FIDIC Red Book and FIDIC Yellow Book. The source of funding was (EC – ISPA). |
10/2003 – 11/2003 |
Romania; Bucarest |
AWT - Austrian Water Technologies, Vienna |
Expert for Tender Evaluation |
Re-evaluation of tenders for public works under ISPA – “EFORIE SOUTH Wastewater Treatment Plant”. ISPA Project 2000/RO/16/P/PE/003-04. FIDIC Plant and Design Build Contract |