CV 2000 to 2010

 

12/2008 – 12/2011

Turkey

H. P. Gauff Ingenieure GmbH & Co. KG, Frankfurt, Germany

Mr. Joachim Glasenapp

Team Leader - Engineer According to FIDIC P&DB

Supervision of construction for Sanliurfa biological WWTP for Organized Industrial Zone 2 with 1200 ha Infrastructure (roads, Wastewater & Stormwater networks, electrical and natural gas network, telecommunication, water supply and storage tank); FIDIC P&DB-Contract Conditions; EuropeAid/125260/D/SER/TR Total value of Consultant’s contract: 1.6 million €.

4/2008 - 4/2009

Croatia

Steinbacher- Consult/SCE

Procurement Expert/ Expert for Tender Evaluation

Works tender evaluation for EuropeAid 125770/D/WKS/HR/1 Construction of Waste Water Treatment Plant in the Town of Karlovac, Contract Conditions, ca. 16 million €.

Preparation of FIDIC Plant & Design build Contract Tender Dossier EuropeAid/127425/D/WKS/HR Construction and Rehabilitation of Water Supply and Wastewater Systems in the Town of Karlovac, FIDIC P&DB Contract Conditions, ca. 18 million €

and Supply Tender Preparation according PRAG.

2/2007 – 7/2008

Turkey

H. P. Gauff Ingenieure GmbH & Co. KG, Frankfurt, Germany

Team Leader/ Project Manager - Engineer According to FIDIC CoC

Water Supply and Sewerage Project Sivas (250,000 Inhabitants)

Construction Supervision Phase:

1. Lot 1, Water Supply Network

2. Lot 2, Sewerage and Storm water System (FIDIC RED BOOK)

3. Lot 3, Full Biological WWTP (FIDIC P&DB BOOK)

Supervision of construction for SIVAS WWTP 79,000 m3/day; FIDIC P&DB-Contract Conditions and Stormwater Network FIDIC Red Book Contract Conditions; Total value of Consultant’s contract: 1.7 million €.

7/2006-3/2007

Turkey; Sanliurfa

H. P. Gauff Ingenieure GmbH & Co. KG, Frankfurt, Germany

Team Leader and Process Engineer

Feasibility Study Sewage Disposal and WWTP Sanliurfa (first stage 680,000 p.e. & 140,000 m3/day; second stage 910,000 p.e.); funding by KfW, Variant Analysis WWTP and design and analysis of sludge disposal alternatives.

09/2006 - 11/2006

Bulgaria; Sofia

EC Delegation

Independent Observer, Procurement Expert

Works tender evaluation for EuropeAid 123191/D/WKS/BG – Bourgas-Meden Rudnik Wastewater Collection and Treatment in Bulgaria

3/2006 to 07/2007

Bulgaria; Lovech/ Sevlievo/Montana

Safege /France

Team Leader/ Project Manager Supervision

Supervision of construction for Lovech; 40,000 m3/day, Montana 48,000 m3/day & Sevlievo; 32,000 m3/day WWTPs; wastewater collection and treatment utilities in Bulgaria, ISPA-Project No. 2002/BG/16/P/PE/011 012 014; EUROPEAID/116754/D/SV/BG; Conditions of contract: FIDIC Plant and Design Build Book. Total value of Consultant’s contract: 2.9 mill. €.

11/2004 to 05/2005

Bulgaria; Rousse and Sliven

IC Vienna

Process Design Engineer

Preparation of Investment Projects for “Upgrading of the whole water cycle processes for Water and Sewerage Systems in Rousse (38,000 m3/day and Sliven (32,000 m3/day)”. Drinking water and sewer networks according to FIDIC Red Book; WWTPs according to FIDIC Plant and Design Build Book; FS and AP under the ISPA Financial Instrument.

 

03/2005 to 06/2006

Germany, Poland, Russian Federation

IPRO Dresden

Process Design Engineer

Preparation of Investment Projects for Upgrading of Water and Sewerage Systems in Frankfurt/Oder, Piła, and Khabarovsk. Optimisation of WWTPs.  Underground Treatment Process for Drinking water.

05/2002 to 09/2002

Macedonia Samokov Region

PROWA Black & Veatch GmbH

Team Leader and Process Engineer

Feasibility Study Urban Water Supply System for the Samokov Region. ISPA Measures.

08/2001 to 03/2004

MacedoniaMEAP-Programm

PROWA Black & Veatch GmbH

Programme Manager / Process Design Engineer/

Project Manager Supervision

Municipal and Environmental Action Programme (MEAP)

Rehabilitation / extension / new construction of a multitude of Water Works and WWTPs and sewerage systems, programme control and management, design and engineering, tender documents and procurement, implementation, commissioning, works supervision.

Capacities of 40,000 to 330,000 PE ; Conditions of contract: FIDIC Red Book and FIDIC Plant and Design Build Book. Funding: EBRD. Total value of Consultant’s contract: 4.9 mill. €.

Draft design, Tender Dossier, Evaluation and Contracting for the WWTP Kumanovo, FIDIC Plant and Design Build Book, (16 m Sfr), (Seco Swiss)

09/1998 to 04/2000

Macedonia

PROWA Black & Veatch GmbH

Process Design Engineer

Feasibility study for the catchment area of the Studencica-Zletovica (RWSS) Water Supply System. This system comprises the source, 78 km of main pipelines, the main distribution station, pressure valve stations, pump stations and the local networks (KfW-Financed).

1/2004 to 3/2004

MacedoniaStip & Veles

 

Prowa Consulting & Contracting GmbH

Procurement Expert

 

Review of the Preliminary Study (technical and contractual tasks).

WWTP’s Stip (48 000 p.e) and Veles (56 000 p.e.) prepared by MOTA & COMPANHIA, sa./COBA.  Advice to the Water Utilities of Stip and Veles for the Construction of the Wastewater Treatment Plant’s.

11/2001 – 10/2003

Montenegro Podgorica

PROWA Black & Veatch GmbH

Team Leader and Process Expert

Pre-Feasibility Study WWTP Podgorica (90 000 p.e.), Montenegro, financed by municipality.

Design of Drinking Water Reservoir Lyubovic, Podgorica

04/2001 to 09/2001

Poland; Warschau

HPC Harress-Pickel-Consult AG

Expert for Tender Evaluation

Independent Observer for Evaluation of tenders for works under PHARE, Poland, Project PL 9907.02: Bytom Waste Water Treatment Plant (5-6/2001), FIDIC Plant and Design Build Contract

Independent Observer for Evaluation of tenders for works under PHARE, Poland, Project PL 9907.03: Modernisation and Extension of the Central WWTP in Tomaszów Mazowiecki – Sludge part (7-8/2001), FIDIC Plant and Design Build Contract

07/2003 to 09/2003

Turkey, Ankara

HPC Harress-Pickel-Consult AG

Expert for Tender Evaluation

Evaluation of service tender: Technical Assistance for Environmental Heavy Cost Investment Planning, Turkey, EUROPEAID/114715/D/SV/TR,(6-7/2003)

04/2003 to 06/2003

Slovenia

HPC Harress-Pickel-Consult AG

Expert for Tender Evaluation

Evaluation of tenders for works under PHARE  - contract  N° 2003/58533 Slovenia (5/2003): The waste water treatment plant and corresponding sewage system Volče” and “Ecological Rehabilitation  of the Idrijca River”, FIDIC Red Book. 

9/2002 to 4/2004

Latvia; Rezekne

AWT - Austrian Water Technologies, Vienna / SAFEGE

Process Expert for Potable Water Treatment

Development of the services for the whole water cycles in the river basins of eastern Latvia and Rèzekne city (19 municipalities-project) Europeaid/112990/D/SV/LV. Used Contract Conditions were FIDIC Red Book and FIDIC Yellow Book. The source of funding was (EC – ISPA).

10/2003 – 11/2003

Romania; Bucarest

AWT - Austrian Water Technologies, Vienna

Expert for Tender Evaluation

Re-evaluation of tenders for public works under ISPA – “EFORIE SOUTH Wastewater Treatment Plant”. ISPA Project 2000/RO/16/P/PE/003-04. FIDIC Plant and Design Build Contract