CV 1990 to 2000

 

 

 

 

 

 

5/1999 to

10/2002

Germany/Wismar

IB ott-consult/

Prowa Black & Veatch

Process Design Engineer

Process Water Treatment for the Polystyrol-Plant of JACKON GmbH Wismar

1/1999 to 4/2003

 

Germany; Wernige-rode

Black & Veatch Germany

Project  Manager Supervision and Process Design Engineer

Rehabilitation and Extension of Municipal Water Works Wernigerode 

Surface water treatment from Zillierbach lake

Design, upgrading of technology, Tender Documents and procurement, Leader supervision team, co-ordination, Capacity 10,000 m3/d

1/1998 to

7/1999

Germany/ Halle and Zeitz

Black & Veatch Germany

Project manager

-Rehabilitation and Extension of Industrial Water Treatment Plant Leuna AG Halle-Daspig: Treatment plant for polluted river water from the Saale river,Capacity: 330,000 m3/d

-Rehabilitation and Extension of Industrial Water Treatment Plant Radici AG Zeitz: Industrial water treatment plant, Treatment of heavy polluted water from the Elster River, incl. micro filtration and reverse osmosis/nanofiltration,

Basic engineering, selection and design of the plant equipment, evaluation of initial investment and operating cost, Tender documentation, Procurement, Capacity: 88,000 m3/d

1995 to date

Germany

Ott-Consult Dresden

Manager / Process Design Engineer - Preparation of Tender Dossiers

Design of process and structural, mechanical and electrical designs (removal of iron, manganese and organic compounds) costing, financing, and cost recovery schemes, Engineering, Tender and Procurement Documents, Evaluation, EIA, implementation, Management of construction supervision, works commissioning and start-up. Capacities of 40,000 to 630,000 PE,

06/2001 to 04/2002

Republic of Uzbekistan

PROWA Black & Veatch GmbH,

Team Leader and Process Engineer

System Pressure and Supply Interruption Analysis in the cities of Bukhara and Samarkand. (Pressure Monitoring Programme and Leak detection), financed by World Bank

01/1998 to 10/1998

Turkey; Siirt &Sivas

Ott-Consult Dresden in co-operation with cogito Frankfurt/Main

Process Engineer

Pre-Feasibility Studies WWTP Siirt (138 000 p.e.) and WWTP Sivas (330 000 p.e.), financed by KfW.

1998 to 2000

Republic of Macedonia

 

Process Design Engineer

Feasibility study for the catchment area of the Studencica-Zletovica (RWSS) Water Supply System. This system comprises the source, 78 km of main pipelines, the main distribution station, pressure valve stations, pump stations and the local networks (KfW)

01/1995    to 12/2001

Germany/

Chemnitz

PROWA Black & Veatch GmbH

Project Manager / Process Designer/ Team Leader Supervision

Central WWTP Chemnitz-Heinersdorf: Refurbishment and new construction, Process Engineering, Basic and Detailed engineering, tender documents and procurement, Site Supervision, Refurbishment of waste water pumping station 14,000 m3/h, Biological phosphorus and nitrogen removal, Sludge treatment, incl. Biogas utilisation, Biological and chemical exhaust air treatment, Capacity: 630,000 PE, 100,000 m³/d, Initial Investment: 135 million Euro. Financed by municipality. The contract Conditions are similar with FIDIC Yellow Book.

1/1995

To

5/1996

Croatia and Slovenia

PROWA Black & Veatch GmbH

Project Manager

Reconstruction and extension of the WWTPs  Senj and Velenje

Elaboration of conceptual design

1990-1994

Germany/

Sachsen,

Sachsen-Anhalt, Thüringen

EVU Stolzenhain

Project Manager / Process Designer/ Team Leader Supervision

Entwicklung und Bau von Containerkläranlagen

Planung, Konstruktion und Abwicklung

Containerkläranlagen bis 5000 EGW mit biologischer Phosphor- und Stickstoffentfernung, Wirbelbettreaktoren (MBBR)

 

1994-2003

Germany/

Köthen

Prowa Black & Veatch

Halle/Saale

Project Manager / Process Designer/ Team Leader Supervision

Kläranlage Köthen; Basic & Main Design, ”Biofilm technology”, Biogas & CHP, Detailengineering, Tender-Documentation, Supervision, Trial operation, Kläranlage mit biologischer Stickstoff- und Phosphorelimination (MBBR), Capacity  49 000 PE; Investment: 13 million €